艾利讯
广州市艾利讯电子科技有限公司

High and low temperature impact test chamber

Product Mode: Fixed mode of products: Test Speed: Number of tests: Equipment size: Description: The three box equipment is divided into three parts: high temperature zone, low temperature zone, and testing zone. The test product is placed in the testing zone, and the temperature of the high or low temperature zone is flushed into the testing zone for impact. The test product is static. 2. Adopting a touch based graphical control interface, the operation is simple. The 3 impact methods apply the air path switching method to import the temperature into the testing area for conducting cold and hot impact tests. When subjected to high or low temperature impacts, the maximum time can reach 999H and the maximum cycle period can reach 9999 times. The 5 system can be used for automatic cycle engine or manual selective impact, and can set the start of three zone impact, cold impact, and hot impact. The cooling system adopts a binary freezing system with fast cooling effect, and the cooling method is water-cooled. 7 three boxes can be tested for impact at room temperature, 8 high and low temperature conversion time: within 10 seconds (other requirements to be agreed upon) 9. Implement the standard and test method: GJB150.5 temperature shock test; GJB360.7 temperature shock test; GB/2423.22 Temperature Shock Test

Main technical parameters

The three box equipment is divided into three parts: high temperature zone, low temperature zone, and testing zone. The test product is placed in the testing zone, and the temperature of the high or low temperature zone is flushed into the testing zone for impact. The test product is static.

2. Adopting a touch based graphical control interface, the operation is simple. The 3 impact methods apply the air path switching method to import the temperature into the testing area for conducting cold and hot impact tests.  

When subjected to high or low temperature impacts, the maximum time can reach 999H and the maximum cycle period can reach 9999 times. The 5 system can be used for automatic cycle engine or manual selective impact, and can set the start of three zone impact, cold impact, and hot impact.  

The cooling system adopts a binary freezing system with fast cooling effect, and the cooling method is water-cooled.  

7 three boxes can be tested for impact at room temperature, 8 high and low temperature conversion time: within 10 seconds (other requirements to be agreed upon)

9. Implement the standard and test method: GJB150.5 temperature shock test; GJB360.7 temperature shock test; GB/2423.22 Temperature Shock Test


48c5447aa06f6567ef998cc883c8e3e7.jpg


  • 官网二维码

    官网二维码

  • 国际网站

    国际网站

  • 阿里巴巴

    阿里巴巴

广州市艾利讯电子科技有限公司
联系电话:Wechat /Facebook / Whatsapp
+8618928987982 020-39921845(伍经理)
公司电话:020-39921845
企业邮箱:qx668798@163.com / allieson@163.com
公司官网:www.allison-tm.com
工厂地址:广州市番禺区石基镇旦岗西街22号
GUANGZHOU ALLISON ELECTRONIC TECHNOLOGYCO.,LTD.
Add: No. 22, Xijie West Street, Danggang Town, Shi Ji Town, Panyu District, Guangzhou City, Gudong Province, China
Tell / Wechat / Facebook / Whatsapp:+8615915832210 (Allie)
Tell:+86 020-39921845
Mail: qx668798@163.com / allieson@163.com
Web: www.allison-tm.com
Copyright © GUANGZHOU ALLISON ELECTRONIC TECHNOLOGYCO.,LTD. 粤ICP备18046960号-2