We use 304 # hose and our independently developed quick release fixture for water outlet docking. PLC program control, equipped with a 10 inch touch independent display screen, pipe diameter switching device, pointer pressure gauge+high-precision pressure sensor, switch electric valve, start button switch, independent emergency stop button, related work operation indicator lights, etc.
PLC control, one click start test. The system automatically determines whether the product is qualified or unqualified, and displays it through the qualified and unqualified indicator lights. The relevant test data (qualified - green light, unqualified - red light with sound and light alarm) can be exported and printed through USB. The testing machine adopts ergonomic design, and the equipment operation adopts a self-developed system, which is easy to operate and does not require a dedicated person to operate.




























