艾利讯
广州市艾利讯电子科技有限公司
cureent > home > News

What are the specific testing conditions for the water hammer pulse fatigue testing machine of water purifiers?Performance testing equipment for water

2026-05-08 08:57

Standard test conditions (based on GB/T 30307-2013, QB/T 4144-2010)


-Environment: Temperature 25 ± 2 ℃; Humidity 45% -95% RH; atmospheric pressure.


-Medium: clear water/deionized water; Temperature range of 10-40 ℃ (standard range of 20-30 ℃).


-Pressure parameters: - Pulse pressure: 0.1MPa (valley value)


→ 1.05MPa (peak), adjustable from 0-1.2MPa.


-Voltage control accuracy: ± 0.5% FS; boost rate ≤ 0.05MPa/s.


-Pulse cycle: - Frequency: 6-45 times/min (commonly 0.5-2Hz).


-Frequency: Standard ≥ 500 times, reinforcement 100000 times.


-Control: PLC+industrial computer; Real time pressure curve; Automatic data storage/alarm.


Test content


1. Water hammer pulse fatigue test (core) - cyclic waveform: 0.1MPa → 1.05MPa → 0.1MPa, simulating valve start stop water hammer impact. -Testing items: - No leakage, no cracks, no permanent deformation. -The interface/end cap/weld seam is free of cracks, and the sealing ring does not fail. -Stable peak pressure without abnormal pressure drop. -Applicable: complete machine, filter bottle, RO membrane shell, pressure tank, connector/pipeline.  


2. Voltage withstand pulse life test (alternating fatigue) - pressure cycle: 0.1MPa → 0.8MPa → 0.1MPa, with 100000 cycles. -Assessment: Structural durability and sealing fatigue resistance under long-term alternating pressure. -Judgment: No leakage, no deformation; Flow attenuation ≤ 15%.


3. Static pressure resistance test (static holding pressure) - Step by step pressurization: starting from 0.1MPa, holding pressure for 10 minutes at each step, up to 1.6MPa. -Testing: No leakage during pressure maintenance; Pressure drop ≤ 0.05MPa/30min.  


4. Water hammer impact+temperature coupling test (environmental stress) - High temperature water hammer: 40 ℃ hot water+1.05MPa pulse, cycling 50000 times. -Hot and cold alternation: run 90 ℃ hot water for 30 minutes → run cold water (15 ℃) for 30 minutes, with a cycle of ≥ 100 times. -Assessment: Heat aging resistance of seals, thermal deformation of plastic parts, and thermal shock resistance of structures.  


5. Burst pressure test (ultimate strength) - continuous pressure rise: rate of 0.5MPa/s until rupture, record the burst pressure. -Qualified threshold: filter bottle ≥ 3.5MPa; The whole machine/membrane shell is ≥ 2.4MPa.


6. Sealing and Leakage Detection - Pressure Leak Detection: Focus on detecting leaks at interfaces, end caps, welds, and sealing rings. -Pressure drop method: hold pressure for 30 minutes, pressure drop ≤ 0.05MPa.

f675ce3418ddfa79ee143124a67d4874.jpg

  • 官网二维码

    官网二维码

  • 国际网站

    国际网站

  • 阿里巴巴

    阿里巴巴

广州市艾利讯电子科技有限公司
联系电话:Wechat /Facebook / Whatsapp
+8618928987982 020-39921845(伍经理)
公司电话:020-39921845
企业邮箱:qx668798@163.com / allieson@163.com
公司官网:www.allison-tm.com
工厂地址:广州市番禺区石基镇旦岗西街22号
GUANGZHOU ALLISON ELECTRONIC TECHNOLOGYCO.,LTD.
Add: No. 22, Xijie West Street, Danggang Town, Shi Ji Town, Panyu District, Guangzhou City, Gudong Province, China
Tell / Wechat / Facebook / Whatsapp:+8615915832210 (Allie)
Tell:+86 020-39921845
Mail: qx668798@163.com / allieson@163.com
Web: www.allison-tm.com
Copyright © GUANGZHOU ALLISON ELECTRONIC TECHNOLOGYCO.,LTD. 粤ICP备18046960号-2